内胎英文合同范本1
Quality-eternal Investment Co., Ltd.
编 号(No.): ACM001
签约地(Signed at):伦敦London 日 期(Date): 卖方(Seller): 地址(Address):
电话(Tel): 传真(Fax):
买方(Buyer):
地址(Address):
电话(Tel):
买卖双方经协商同意按下列条款成交:
The undersigned Seller and Buyer have agreed to close the following transactions according to the terms and conditions set forth as below:
1. 货物名称、规格和质量 (Name, Specifications and Quality of Commodity):数量(Quantity):单价及价格条款 (Unit Price and Terms of Delivery) ::
(除非另有规定,_FOB_、_CFR_和_CIF_均应依照国际商会制定的《20xx年国际贸易术语解释通则》(INCOTERMS 20xx)办理。)
The terms FOB,CFR,or CIF shall be subject to the International Rules for theInterpretation of Trade Terms (INCOTERMS 20xx) provided by International Chamber of Commerce (ICC) unless otherwise stipulated herein.)
2. 总价 (Total Amount):
$5745
3. 允许溢短装(More or Less):2%。4. 装运期限(Time of Shipment): 收到全部货款后20天内装运。
Within 20 days after receipt of full payment by T/T. .
5. 付款条件(Terms of Payment): 出货前付清货款。
Pay total charge before shipment
6. 包装(Packing):
7 品质/数量异议 (Quality/Quantity discrepancy):
如买方提出索赔,凡属品质异议须于货到目的口岸之日起30天内提出,凡属数量异议须于货到目的口岸之日起15天内提出,对所装货物所提任何异议于保险公司、轮船公司、其他有关运输机构或邮递机构所负责者,卖方不负任何责任。
In case of quality discrepancy, claim should be filed by the Buyer within 30 days after the arrival of the goods at port of destination, while for quantity discrepancy, claim should be filed by the Buyer within 15 days after the arrival of the goods at port of destination. It is understood that the Seller shall not be liable for any discrepancy of the goods shipped due to causes for which the Insurance Company, Shipping Company, other Transportation Organization /or Post Office are liable.
8.由于发生人力不可抗拒的原因,致使本合约不能履行,部分或全部商品延误交货,卖方概不负责。本合同所指的不可抗力系指不可干预、不能避免且不能克服的客观情况。
The Seller shall not be held responsible for failure or delay in delivery of the entire lot or a portion of the goods under this Sales Contract in consequence of any Force Majeure incidents which might occur. Force Majeure as referred to in this contract means unforeseeable, unavoidable and insurmountable objective conditions.
9. 仲裁(Arbitration):
因凡本合同引起的或与本合同有关的任何争议,如果协商不能解决,应提交中国国际经济贸易仲裁委员会深圳分会。按照申请仲裁时该会当时施行的仲裁规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。
Any dispute arising from or in connection with the Sales Contract shall be settled through friendly negotiation. In case no settlement can be reached, the dispute shall then be submitted to China International Economic and Trade Arbitration Commission (CIETAC) , Shenzhen Commission for arbitration in accordance with its rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties.
10. 通知(Notices):
所有通知用___文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后___日内书面通知另一方。
All notice shall be written in _____ and served to both parties by fax/e-mail /courier according to the following addresses. If any changes of the addresses occur, one party shall inform the other party of the change of address within ____ days after the change.
11. 本合同为中英文两种文本,两种文本具有同等效力。本合同一式___2__份。自双方签字之日起生效。
This Contract is executed in two counterparts each in Chinese and English, each of which shall be deemed equally authentic. This Contract is in _____ copies effective since being signed/sealed by both parties.
The Seller: The Buyer: 卖方签字:买方签字:
内胎英文合同范本2
Unit: (hereinafter referred to as Party A)
Advertisers: (hereinafter referred to as Party B)
After friendly consultation between Party A and B, in accordance with the principle of mutual benefit and mutual benefit, the following articles are reached on Party A's propaganda and planning on Party B's entrustment:
Article 1: Party A entrusts Party B to publicity planning project: _________________________
___________________________________________________________
The second article: the principle of propaganda and planning
Party B provides the whole process of publicity and planning, including advertising planning and design services, providing reference for Party A's market positioning and market area and serving for decision-making.
The third one: the way of agency
Party a commissioned party B to complete the whole process of propaganda and planning, and entrusted the plane design, advertising agency and other business, fully responsible for the project publicity and planning.
Fourth: the rights and obligations of Party A
1. In the agreed period, Party B should be required to submit the relevant propaganda and planning scheme, and the Party A will assist the organization after the confirmation of the market investigation.
2, it has the right to require Party B to provide written opinions and suggestions from the angle of planning within the scope of the Commission.
3, Party B will be required to provide Party A with planning plans and adjustment of propaganda strategies and suggestions.
4, to approve the overall propaganda strategy formulated by Party B, and to bear all the costs related to publicity and promotion, advertising and so on.
5, payment shall be paid in accordance with the agreement of the contract with Party B for the payment of the publicity and planning fee and on time.
The fifth, the rights and obligations of Party B
1, the party shall have the right to pay the publicity and planning fee in accordance with the requirements of the contract.
2, in accordance with the requirements of Party A and the different stages of the project progress, put forward the advertising plan, after the approval of Party A to organize the implementation.
3, Party B provides:
The newspaper project soft article writing; the project, all kinds of exhibitions, promotions, activities planning.
4, bear the claim or other legal liability caused by Party B's fault.
Sixth: the term of agency
Party A entrusts Party B publicity planning period is divided into: ______ years ___ month ___ to ______ ___ ___ date month year;
Seventh: standard and mode of payment for project publicity and planning
1, publicity planning fees totaling $________ yuan (capital ______________________).
2, after the signing of this contract, Party A will pay to Party B RMB ____________ whole (capital ___________________________) for payment.
3, after the end of the contract, Party A shall pay the balance, namely RMB ____________________ whole (capital ________________________).
The eighth article: liability for breach of contract
1. Party A is responsible for all the losses caused by Party A's failure to provide relevant license and relevant legal documents and preferential policies for activities.
2. If the Party B does not provide the plan of publicity and planning in time because of Party B's reasons, Party A shall investigate the responsibility or terminate the contract.
3. Party A shall have the right to rescind the contract if Party A fails to pay Party B publicity and planning fees according to the agreement.
4. In the course of cooperation, the other party has the right to require the other party to bear the related economic loss by disclosing the business secrets or providing the relevant information to the third party.
5, any party to terminate the contract without authorization to suspend unilateral breach of contract or shall be borne by the defaulting party, must therefore have caused losses to the observant party and liability for breach of contract.
6, in the execution of this contract, if there is a force majeure factor affecting the execution of the relevant provisions, it shall be settled by the two sides and properly resolved. It is not a breach of contract to terminate the contract or change the relevant provisions of the contract on the basis of the agreement between the two parties.
Ninth: Annex
1, both parties may supplement the terms of this contract and sign a supplementary agreement in written form. The supplementary agreement has the same legal effect as this contract.
2. The annexes of this contract are all valid parts of the contract and have the same effect.
3. All matters not specified in this contract and its annexes and supplementary agreements are carried out in accordance with the relevant laws, regulations and regulations of the People's Republic of China.
4. The contract is two copies, each party and Party B has one copy, all with the same legal effect.
5. In the event of a dispute in the performance of this contract, the parties shall settle the dispute by negotiation, negotiation or adjustment, and the parties agree to be arbitrated by the Arbitration Commission.
6. The contract will terminate naturally after the expiration of the contract. If the two parties renew the contract, they shall make a written opinion to the other party seven days before the expiration of the contract.
7. This contract shall come into force on the date of signature or seal of the representatives of the two parties.
Party A: Party B:
Representative: (signature) representative: (signature)
Date: day and date: day and day
中文版
单 位:(下简称甲方)
广告商:(下简称乙方)
甲、乙双方经友好协商,本着互惠互利的原则,就甲方委托乙方的宣传策划事宜,达成如下条款:
第一条:甲方委托乙方宣传策划的项目:_________________________
___________________________________________________________
第二条:宣传策划原则
乙方按甲方规定,提供全程宣传策划包括广告策划与设计的服务,为甲方市场定位及市场区域提供参改依据,为决策服务。
第三条:代理方式
甲方委托乙方全权全程宣传策划,并委托平面设计、广告代理等业务,全面负责本次项目的宣传策划工作。
第四条:甲方的权利和义务
1、在约定期限内要求乙方提交有关宣传策划方案,从市场调查依据确认后再由甲方协助组织实施。
2、有权要求乙方在委托范围内从策划角度提供书面意见和建议。
3、要求乙方向甲方提供策划方案及调整宣传策略和建议。
4、批准乙方制订的整体宣传策略,承担有关宣传推广、广告等所需的各项费用。
5、按合同约定与乙方结算宣传策划费并按时支付。
第五条、乙方的权利和义务
1、有权按照合同要求甲方支付宣传策划费。
2、负责根据甲方要求和项目进度的不同阶段,提报广告计划,经甲方认可后组织实施。
3、乙方提供:
⑴、项目报纸软性文章撰写;⑵、项目各种展销、促销、优惠活动的策划。
4、承担因乙方过错造成的索赔或其他法律责任。
第六条:代理期限
甲方委托乙方宣传策划期限分为: ______年___月___日至______年___月___日止;
第七条:项目宣传策划费的给付标准和方式
1、宣传策划费共计¥________元(大写______________________)。
2、本合同签订后,甲方即向乙方支付人民币¥____________整(大写___________________________)为预付款。
3、活动结束后,甲方向乙方支付合同余款,即人民币¥____________________整(大写________________________).
第八条:违约责任
1、因甲方未提供有关许可证及相关法律文件资料、活动优惠政策而造成损失的,则甲方承担全部责任。
2、如因乙方原因,不及时提供宣传策划方案,甲方追究责任或终止合同。
3、甲方如未按照双方约定支付给乙方宣传策划费,乙方有权解除合同。
4、在合作过程中任何一方泄露商业秘密或将有关资料提供给第三人的,另一方有权要求对方承担相关经济损失。
5、任何一方单方擅自中止合同或解除合同均属违约行为,需由违约方承担因此给守约方造成的相关损失和违约责任。
6、本合同执行过程中,如有因不可抗力因素影响有关条款之执行的,应由双方协商,妥善解决,在双方达成一致意见的基础上而中止合同或改变合同的有关条款的.不视为违约。
第九条:附则
1、双方可对本合同的条款进行补充,以书面形式签订补充协议。补充协议与本合同具有同等法律效力。
2、本合同之附件均为合同有效组成部分,具有同等效力。
3、本合同及其附件和补充协议中未规定的事宜,均遵照_有关法律、法规和规章执行。
4、本合同壹式贰份,甲乙双方各执壹份,均具同等法律效力。
5、本合同在履行中如发生争议,双方应协商解决,协商或调节不成的,双方同意由仲裁委员会仲裁。
6、合同期满本合同自然终止。双方如续订合同,应在该合同期满七天前向对方提出书面意见。
7、本合同自双方代表人签字或盖章之日起生效。
甲 方:乙 方:
代表人:(签章)代表人:(签章)
日期:年 月日 日期: 年 月 日
内胎英文合同范本3
GARMENTS PURCHASE CONTRACT
Contract NO.合同编号:
Date签约日期:
Buyer: 买方:
Seller: 卖方:
This purchase contract (hereafter abbreviated “contract”) is signed by and between the Buyer and the Seller upon equal negotiations based on the Contract Law and other relevant laws and regulations. Both parties agree to sell and buy goods on following terms and conditions.
此销售合同(以下简称“合同”)根据合同法及相关法律法规并经由买卖双方经平等协商后共同签定,买方与卖方均同意以下条款和条件购买和出售货物。
Purchasing Contract terms and conditions of garments Season: 服装采购合同条款:
1. Description, quantity, unit price, total amount and other details of the goods ordered please refer to detail order, invoice and packing list. The name of the issuing company of invoice must be the same as the seller.
采购品名、规格、数量、单价、总价、交期等参考每次采购相应订单、发票及装运单,发票的填开单位必须与本合同中卖方的名称相一致。
2. Country of origin: China原产地:中国
3. Delivery: The seller shall deliver the goods to the warehouse as previously agreed between the two parties.
交货方式:卖方应把货物送交至双方事先约定的仓库。
4. The quality of all the garments shall answer for the updated, valid Standard of the Nation and the industry. In case the garments are unqualified or for other reason that shall ascribe the seller’s fault, which brings losses of or damages (including but
not limited to fine, expropriate, damage to Goodwill, lawyer’s fee and other losses for the buyer ’s breach of law or contract because of the seller fault) to the buyer, the buyer shall has the right to ask seller for damages.
所有服装质量应符合最新、有效的国家标准、行业标准的规定,若卖方交付的服装质量不合格或其他任何可归咎于卖方的责任导致买方遭受的任何损失(包括但不限于罚没款、扣款、商誉损失、律师费及其他因卖方原因导致买方违约、违法所遭受的损失),买方有权要求卖方承担。
5. Seller shall provide 7 original copies of _Approved_ Quality Inspection Certificate for each fabric used to produce MOTIVI different models 7 days before the delivery date. The certificate must be issued by a Chinese official quality testing department, the samples that the seller send to quality test lab shall be representative, can represent the quality of the goods, and the test must follow the Basic Standard GB18401 and include the composition of the fabric. The buyer will settle the payment according to the contract after received the test report and other related documentations (Packing list, Invoice of Goods etc.).
卖方应于交货日七日前向买方提供由中国官方质检部门认可的质检机构出具的所有用来制作服装的面料的合格质检报告原件7 份,卖方向质检机构送检的样品应具有代表性,能够代表大货质量,质检报告应包含纤维含量及国家标准 GB18401 的安全技术要求事项。买方在收到质检报告、装箱单、货物发票等其他文件后按合同约定付款。
6. For all the goods, the seller shall issue invoice to the buyer, the invoice shall be invoiced 所有货物应由卖方向买方开具发票,发票抬头需开列买方单位名称为
Kind of invoice issued: People’s Republic of China VAT invoice
发票开立种类:_增值税专用发票。
7. Terms of Payment: Total amount of payment of goods shall be paid in RMB within 30 days issued the invoices.
付款: 开立发票后30日内以人民币支付。
Upon signing the contract, the seller shall provide bank information for the buyer to effect payment.
买卖双方签定订购合同后,卖方需提供公司银行资料给予买方支付货款.。
8. Intellectual Property Right 知识产权
All the goods, documents and materials that the Seller gets to may concerns secret and shall procure that its employee, agent and any other persons who may have access to the above-mentioned information keep confidentiality and shall not use it for any purpose at any time or disclose to any third party. The seller shall not sell, transfer any products or materials to any third party except for the buyer products, substandard products, rest products and unused/waste products or materials. In case the seller breaches, the buyer has the right to ask for
indemnification including but not limited investigation fees, lawyer’s fees,
compensation as well as all other fees according to the stipulations or Chinese laws. 卖方接触到的买方及集团的物品、文件资料均可能涉及买方及其关联公司的知识产权,尤其是可能包含的买方商标、集团的其他商标,著作权及商业秘密。卖方应对其知悉的买方及其关联公司的商业秘密进行保密,并应促使卖方所有接触到买方秘密信息的任何雇员、代理人、客户或其他人士对该信息保密,不得在任何时候为任何目的使用或者向任何第三人披露。卖方不得向除买方及集团以外的任何单位和个人销售、转让涉及买方及米罗利奥集团的商标、标识标记、著作权等知识产权的产品或资料,即使对于过季品、等外品、富余品和废弃不用的产品或资料也不例外。若卖方违反约定,买方有权根据约定及中国法律规定要求卖方承担包括但不限于调查费、律师费、赔偿金在内的一切赔偿责任。
9. Both parties will try to resolve any dispute concerning the contract amicably. If the dispute can not be resolved by negotiation, any party may initial legal action.
买卖双方在履行本合同时如有争议应先以友好协商方式解决,如协商不成买卖双方可将争议送交由提出诉讼方所在地之法院进行诉讼.
10. All appendixes to this contract should be bonded to the contract as a whole.
内胎英文合同范本4
Contract No.: ________________________.
Date of Signature: ____________________.
Place of Signature: ____________________.
This Contract is made and entered into through friendly negotiation by and between China ____________________ (hereinafter referred to as “Client”), as one party, and____________________ (hereinafter referred to as “Consultant”), as the other party, concerning the technical consultancy service of__________, under the following terms and conditions:
Article 1 Contents of Technical Consultancy Service
Whereas Client desires to obtain the technical consultancy service from Consultant and Consultant has agreed to perform such services.
The Scope of Technical Services is defined in Appendix 1.
The Time Schedule for the Services is shown in Appendix 2.
The Manning Schedule is described in Appendix 3.
Consultant shall complete the Services within __________months from the Effective Date of this Contract and furnish the final technical service report, including drawings, designing documents, all kinds of standards and photos, within ____ months. Consultant shall keep aware, free of charge, Client of the latest development of similar projects and any progress made in order to improve the designing of the project.
Article 2 Both Parties' Responsibility and Liability
Client shall furnish to Consultant the pertinent data, technical service reports, maps and information available to him and shall give Consultant the reasonable assistance necessary for carrying out of his duties. Particularly Client shall nominate a general representative who shall be available at reasonable time.
Client shall assist Consultant with the responsible authorities for obtaining visas, work permits, and other documents required by Consultant to enter the country and to have access to the Site of the Project. The above expenses shall be borne by Consultant.
Consultant shall furnish a sufficient number of competent personnel to perform its obligation hereunder, in addition to those personnel specifically listed in Appendix 3. All personnel employed by Consultant in carrying out the work shall be exclusively Consultant's responsibility, and Consultant shall hold Client harmless from any claims of any kind by Consultant's personnel arising out of any acts by Consultant or its personnel in connection with the work performed hereunder.
Consultant shall provide Client with all the technical service reports and relevant documentation within the Scope of Technical Services and within the Time Schedule for the Services.
Consultant shall assist Client‘s personnel in his country in obtaining visas and in arranging lodgings. Hotel and boarding expenses shall be borne by Client. Consultant shall supply Client’s personnel with office space and necessary facilities as well as transportation.
Consultant shall be responsible for and shall indemnify Client and his employee in respect of injury to person or damage to property occurring in connection with the services, to the extent that such damage or injury directly results from negligence of Consultant's personnel while engaged in activities under this Contract. Consultant shall be liable only to the work under this Contract.
Any and all liability of Consultant with respect to this Contract shall be limited to the Total Contract Price received by Consultant for his profession services and shall terminate upon expiration of the warranty period set forth in Article .
Article 3 Price and Payment
The total contract price is__________(say __________________only) in ________(currency). The breakdown prices of the above mentioned total contract price are as follows:
Contract Price for Item 1: ______(say ____________only) in________ (currency);
Contract Price for Item 2: ______(say ____________only) in________ (currency);
Contract Price for Item 3: ______(say ____________only) in________ (currency);
Contract Price for Item 4: ______(say ____________only) in________ (currency).
The total contract price shall include all the service and technology provided by Consultant. The total contract price shall be firm and fixed and shall not fluctuate with any inflation. The total contract price shall include all charges and expenses incurred by Consultant in performing his obligations both in his own country and in the People's Republic of China and includes the expenses incurred in sending the Technical Documentation to Client's office by all kinds of forms.
In the event of Force Majeure as defined in the Contract, the total contract price shall be readjusted through friendly negotiations between the parties. If Client requires services not contemplated in the Scope of Services, the parties shall friendly discuss an amendment to the total contract price. Any such amendment shall be in writing countersigned by both parties. This document shall then form integral part of the Contract.
All payments to be made by Client to Consultant under the present Contract shall be made by telegraphic transfer. In case of any payment by Client, the payment shall be effected through __________ in China to _________ for the account of Consultant.
In consideration for the services provided by Consultant hereunder, Client shall effect the payment to Consultant in accordance with the following manner and percentage:
_______ percent (________ %) of the total contract price, (Say: ________ only), shall be paid by Client to Consultant within ________ (____) days after the client has received the following documents provided by Consultant and found them in order.
A. One (1) original and two (2) duplicate copies of Consultant's government approval, or a written statement of the competent authorities or relevant agency of Consultant's country certifying that such document is not required;
B. One (1) original and one (1) duplicate copy of Irrevocable Letter of Guarantee for advance payment issued by Consultant's Bank in favor of Client covering_______(Say:________ only), specimen of which is as per Appendix 4;
C. Five (5) copies of profoma invoice covering the total contract price;
D. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;
E. Two (2) copies of sight draft.
The said shall be delivered by Consultant not later than ____days after the effective date of the ________present Contract.
________percent (____%) of the Contract price for Item 1, (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.
A. Ten (10) copies of technical service report on Item 1;
B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;
C. Two (2) copies of sight draft.
________ percent (____%) of the Contract price for Item 2, . ___________ (Say: ____________ only) shall be paid by Client to Consultant within ________ (___) days after Client has received the following documents provided by Consultant and found them in order.
A. Ten (10) copies of technical service report on Item 2;
B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;
C. Two (2) copies of sight draft.
________percent (____%) of the Contract price for Item 3, (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.
A. Ten (10) copies of technical service report on Item 3;
B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;
C. Two (2) copies of sight draft.
________percent (____%) of the Contract price for Item 4, (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.
A. Ten (10) copies of technical service report on Item 4;
B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;
C. Two (2) copies of sight draft.
________percent (____%) of the Total Contract price, (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Client has received the following documents provided by Consultant and found them in order.
A. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;
B. Two (2) copies of sight draft.
In case Consultant is liable for paying to Client the penalty under the Contract, Client shall have the right to deduct it from any said payment.
The banking charges of both parties incurred in China for the execution of the Contract shall be borne by Client and those incurred outside China shall be borne by Consultant.
Article 4 Delivery Schedule
The deadline for the arrival of the Technical service reports CIF _____ is:
A. Technical service report on Item 1: _________months after effectiveness of the Contract;
B. Technical service report on Item 2: _________months after effectiveness of the Contract;
C. Technical service report on Item 3: _________months after effectiveness of the Contract; and
D. Technical service report on Item 4: ________months after effectiveness of the Contract.
Consultant shall inform Client by fax when the Technical service reports are airmailed to Client indicating the date and number of airway bill. Client shall inform Consultant when the Technical service reports have been received.
Should any document be missing or damaged during the transport, Consultant shall be notified accordingly and within two (2) weeks the missing or damaged document shall be replaced by Consultant free of charge.
Article 5 Confidentiality
All data assembled, developed, compiled, reproduced, studied, and prepared in connection with the work done hereunder and furnished to Consultant by Client shall be considered confidential and shall not be divulged to any person, firm or corporation other than Client or its designated representatives. This Clause shall remain binding on Consultant notwithstanding the termination of the Contract for any reason.
Within the validity period of Contract, both parties shall take proper measures to keep the materials or information strictly confidential. The other party shall not disclose or divulge to any third party without prior written consent of one party.
Either party shall be obliged to keep confidential any secret information of the other party, which either party and its personnel may obtain or be accessible to in the course of the performance of Contract. Either party shall not make use of or disclose such secret information obtained from the other party without prior written permission issued by the other party.
Article 6 Taxes and Duties
All taxes and duties in connection with and in the execution of Contract levied by the Chinese government on Client in accordance with the tax laws of PRC shall be borne by Client.
All taxes and duties levied by the Chinese government on Consultant, in connection with and in the execution of Contract, according to Chinese tax laws and the agreement between the government of PRC and the government of Consultant's country for the reciprocal avoidance of double taxation and the prevention of fiscal evasion with respect to taxes on income shall be borne by Consultant.
Client is legally obliged to withhold, as a withholding agent, the amount of taxes pro rata each taxable payment under Contract and pay them to the relevant Chinese tax authorities. After receiving the tax receipts issued by the relevant Chinese tax authorities for the aforesaid withholding taxes, Client shall forward them to Consultant without undue delay.
All taxes and duties arising outside PRC in connection with and in the execution of Contract shall be borne by Consultant.
Article 7 Warranty
Consultant warrants that he has the experience and capability to efficiently and expeditiously perform the services in a satisfactory manner and that the services performed by him under this Contract shall be performed by competent personnel in accordance with accepted standards.
In the event of a failure of Consultant to provide Client with satisfactory services within the scope of work described in Appendix 1 at any time for any reason within the control of the Consultant, Client may notify Consultant of such dissatisfaction. Consultant shall be afforded a period of _____ days to correct or remedy the matter. Should Consultant within the time afforded by Client fail to correct or remedy the matter to the satisfaction of Client, all charges shall cease forthwith until such time as Consultant is able to provide satisfactory services in accordance with the Scope of work described in Appendix 1.
The Consultant‘s guarantee liability shall expire _____ months after its consultancy service is finally inspected and accepted by Client, or after final payment is made.
Article 8 Ownership of Technical Service Reports
Final version of the technical service report submitted to Client and all relevant data such as maps, plans and supporting material compiled in performing the Scope of Services, shall be the property of Client. Such materials shall be sorted and indexed by Consultant prior to transmission to Client.
Consultant shall be permitted to retain copies thereof, provided however that such materials, including the material furnished by Client as stated in Article 5 of this Contract, shall not be used by Consultant for purposes not related with this Project without the prior written approval of Client.
Article 9 Assignment
Neither Client nor Consultant shall assign or sublet their rights or obligations hereunder without the prior written consent of the other party.
Article 10 Termination
If, due to the responsibility of Consultant, the technical service reports have not been delivered at dates according to the delivery schedules as stipulated in Article 4 of the Contract, Consultant shall be obliged to pay to Client penalty for such delay in delivery at the following rates:
A. ______ percent (____%) of the total contract price per week for the first four weeks;
B. _____ percent (____%) of the total contract price per week from the fifth week to the eighth week;
C. ______ percent (____%) of the total contract price per week from the ninth week of delay.
Odd days less than one (1) week shall be counted as one (1) week for calculating the liquidated damage.
The total liquidated damage for late delivery shall not exceed ______ percent (____%) of the total contract price. Payment of the liquidated damage for late delivery shall not release consultant from its obligation to deliver technical service reports.
Client may, without prejudice to any other remedy for Consultant's following breach of Contract, terminate Contract in whole or in part by a written notice of default send to Consultant, if Consultant
A. Fails to deliver any or all of technical service reports within______(____) days after the scheduled delivery date as specified in Article 4; or
B. Fails to make the technical service reports meet the minimum level of Acceptance Standards as specified in Appendix 1.
Consultant shall refund to Client all the payments effected by Client to Consultant plus an interest at the rate of______ percent (____%) per annum in case of such a termination.
Either party may, without prejudice to any other remedy, terminate Contract in whole or in part by a written notice send to the other party, if the other party.
A. Fails to perform its confidentiality obligation under Contract; or
B. Fails to perform any other obligations under Contract except minor parts thereof, and does not remedy for its failure within a period of______ (____) days upon receipt of the written notice or a period agreed upon between the parties;
C. Becomes bankrupt or insolvent; or
D. Affected by any event of Force Majeure for more than ______ days.
Article 11 Force Majeure
Should either party be prevented from performing any of its obligations under Contract due to event of Force Majeure, such as war, serious fire, typhoon, earthquake, flood and any other events which could not be expected, avoided and overcome, the affected party shall notify the other party of its occurrence by fax and send by registered airmail a certificate issued by the competent authorities or agency within fourteen (14) days following its occurrence.
The affected party shall not be liable for any delay or failure in performing any or all of its obligations due to the event of Force